Installing a Level 2 EV charger at home costs the price of the charger plus the electrical work to reach it, and the electrical work usually costs more. This guide gives our estimate for each part from government data, explains when a panel upgrade enters the picture, and notes that the federal tax credit for home chargers has ended.

Level 1 or Level 2: what you are paying for

Most EVs come with a cord that plugs into a standard 120-volt outlet. The U.S. Department of Energy's Alternative Fuels Data Center (AFDC) says Level 1 charging adds about 5 miles of range per hour, and that 8 hours at 120 volts can replenish about 40 miles for a mid-size EV. If you drive less than that most days and can charge overnight, Level 1 may be enough and costs nothing extra.

Level 2 runs on 240 volts. AFDC puts it at about 25 miles of range per hour of charging and notes that most homes have 240-volt service available. That is the upgrade most people mean by "installing a charger."

Our estimate for the charger itself

The National Renewable Energy Laboratory's National Residential Efficiency Measures Database (REMDB, 2024 edition) prices home chargers by power output. In 2023 dollars:

Charger powerRetail price (low / middle / high)
7.2 kW (commonly a 40-amp circuit)$184 / $395 / $524
11.5 kW (commonly a 60-amp circuit)$271 / $622 / $748

Low, middle and high are the 10th, 50th and 90th percentile prices. REMDB gives chargers an expected life of about 10 years. It does not give a figure for adding a charger to an existing home, because, as its notes say, removal and retrofit costs were not available, so we estimate the installation separately below.

Tesla's Wall Connector is one of the most common Level 2 units; see Tesla Wall Connector installation cost.

Our estimate for the electrical work

The installation is a new 240-volt circuit from your panel to the parking spot. Two reference points:

  • A government figure for a new circuit. In its heat pump data, REMDB uses an extra $1,384 (2023 dollars) to represent the cost of new 240-volt circuits, based on the average for projects in a Lawrence Berkeley National Laboratory database. That is a useful middle reference for a run of moderate length.
  • Our labor-only estimate. The Bureau of Labor Statistics puts the median pay of electricians at $30.38 an hour in May 2025. If a straightforward job takes 3 to 6 hours and the contractor charges 2 to 2.5 times the worker's pay to cover licensing, insurance, travel and profit (our assumptions), labor alone runs about $182 to $456. Wire, conduit, the breaker and the permit come on top, and grow with distance.

So for a charger in an attached garage next to the panel, expect the low end; for a detached garage or a long outdoor run, expect well above the $1,384 reference. These are estimates, not quotes.

When a panel upgrade is needed

AFDC notes that some homes might have insufficient electric capacity for Level 2 equipment, and that a qualified electrician can add circuits to supply it. Before agreeing to a panel or service upgrade, ask for a written load calculation. Choosing a lower charging current, or a device that pauses charging while other large appliances run, can sometimes avoid the upgrade. Our panel upgrade guide gives the cost if you do need one.

Permits and who does the work

AFDC says appropriate permits may be required from the local building and permitting authorities, and that in many areas a site installation plan must be submitted for approval before installation. A licensed electrician normally pulls the permit and books the inspection. Ask whether the quote includes the permit fee.

Hardwired chargers and plug-in chargers both need a dedicated circuit sized for the charger. If you buy a plug-in model, the outlet must be rated for continuous charging; ask the electrician which outlet and breaker they will install.

The federal tax credit has ended

The Alternative Fuel Vehicle Refueling Property Credit (Section 30C) used to cover part of the cost of a home charger in eligible areas. The IRS says that credit is not allowed for any property placed in service after June 30, 2026 (IRS FAQ on the 2025 law changes). A charger placed in service on or before that date may still qualify on that year's return under the IRS rules.

AFDC notes that state and utility incentives may be available to help offset the cost of charging equipment. Many utilities also offer a lower electricity rate for overnight charging. Check your utility's website before you buy, since some rebates require a specific approved charger.

Questions to ask before you book

  1. What amperage circuit will you install, and does my panel have room for it?
  2. How far is the run, and is the price for wire, conduit and trenching included?
  3. Is the permit and inspection in the quote?
  4. Will the charger be hardwired or plugged in, and why?
  5. Does my utility have a charger rebate or an EV rate that needs a specific charger model?

Related guides and tools

To estimate what charging adds to your monthly bill, use the electricity bill calculator. To compare running costs with a gas car, try the EV vs gas savings calculator. If the run needs new wiring through the house, see our partial rewiring cost guide.

R. K. Tiwari, owner and editor of TheDigitalLife

Written by TheDigitalLife Editorial Team

Edited by R. K. Tiwari

Owner & Editor

R. K. Tiwari is the owner and editor of TheDigitalLife. He checks each guide against official U.S. sources before it is published.

About the editor and our editorial standards